Clover Incinerator

Nanjing Clover Medical Technology Co., Ltd. is a leading waste incinerator manufacturer in China.

Waste Incinerator for Cleaner World

Medical Incinerators / Animal Crematory / PLC Incinerators

Contact with Us now for Inquiries

Call us on 0086-25-8461 0201 Email: sales@clover-incinerator.com

Incinerators Spare Parts

Full sapre parts in stock for incinerator operation.

Medical Waste Incineration

Incineration treatment technology for hospital medical waste.

We Work Efficiently

Our Sales Staff and Engineer are Wating for your inquiries and questions.

24/7 Live Support

Get To Know Further Information Before You Purchase. Contact with us by Phone or Email.

How to Delivery?

We arrange incinerator shipping to your local site included shipping cost and insurance.

Get Latest Incinerator Catalogue

Download PDF format Incinerator catalogue for your reference

Incinerator Dispatch Showcase

We delivery different capacity and model waste incinerator to all around the world. Find the business case to know more about the incinerator and us.

Welcome!

Nanjing Clover Medical Technology Co.,Ltd.

www.Incinerator.info  |   Call Us On  +86-25-8461 0201

Company Latest News

New Medical Incinerator Ready for Shipping

New medical waste incinerator for Afghanistan and Macau in October,2014

Regarding Fumigation/Disinfection Certificate

Fumigation/Disinfection Certificate is a certification document that Fumigation/Disinfection upon the shipping wooden carton or container, to kill the virus or pest. When we do custom clearance in China (Export),China custom...

Clover Incinerator in use worldwide

List of Incinerator Customers   Asia: East Timor Papua New Guinea Indonesia Kazakhstan Viet Nam Georgia United Arab Emirates Iraq Africa: Somalia Mauritius MoroccoI Tanzania Rwanda Zambia Oceania: Australia Europe:...

Single Chamber Municipal Incinerator

the Single Chamber Incinerator

Burning Capacity: 400kg/ Hr ( Maximum Combustion time is 6 times/ Day) Chimney External Diameter: not more than 400mm Fan Power: must not exceed 1.1kw Voltage: 220V Oil Consumption: Must...

Waste Incineration Treatment Model TS1000 1000kgs per hour Top Feeding

Items/Model TS1000 Picture   Principle Waste Incineration Treatment Burn Rate Average 1000 kg/hour Feed Capacity Average 3000kg/feeding Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 4800Liter Internal Dimensions 400*120*100 cm Secondary Chamber...

Regarding website of clover medical limited

You may find several different website of clover medical limited, that’s true. we have some different domain and website for market, but please note the main website is www.clover-incinerator.com we...

High quality refractory lining and insulation Large full size incinerator

PRIMARY CHAMBER Heavy-duty steel casing High quality refractory lining and insulation Large full size top load counterbalanced door 1 x oil/gas fired ignition burners operated on/off SECONDARY CHAMBER Heavy-duty steel...

Small Capacity incinerator for small pet and other waste

small incinerator with primary combustion chamber 200Liters to 400Liters. this is good idea and capacity for small pets like cat, bird and small dog and other some other medical waste...

3 Chamber Incinerator

Primary chamber:Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic)  01 x temperature sensor points with complete internal fans.Secondary Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.Third Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.Integrated dual flu gas washer: Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.Chimney:Heavy duty 5mm or more stainless steel casing mild steel casing.Stack cap/spark arrestors.Control Panel:a.Temperature Monitoring with 4 digit display.b.Thermostat control device for burner (fuel saver)c.Temperature control 0-12 hours.d.Integral fan timer control

INCINERATOR QUESTIONNAIRE

7. Type of waste  : Bio-medical / Hazardous / Municipal / Trash  = ALL and Mixed8. Any other : Rubber, rubber tyres, Batteries, green waste, paper and cardboard9. Quantity of waste generated per day in kg : 3 -5 tonnes per day10. Duration C incinerator will be used per day : 1 C 8 hours / 1 C 16 hours / Continuous 11. Approximate moisture content: Variable12. Local incinerator operating and emission standards : India / EURO / US-EPA  Australia13. What is the height of the chimney required? : No chimney is required. Flue length should be approximately 2 to 3 metres to join to a downstream process14. Fuel proposed to be used :  LDO / HSD / FO / SKO/ Gas / Other  – No fuel required – Intended to free burn waste products15. Availability of power and type : Electricity if required16. Details of space available :  Not restricted17. Do you require an automatic loading system? : [X ] Yes         [ ] No 18. Do you require a gas scrubbing system? : [ ] Yes         [X ] No 19. How soon do you require the system to be delivered? : Sea Freight to Port of Cairns, Queensland, Australia in approximately Two months20. City and country of use :  Australia21. Whether the location is a coastal area : [ ]Yes         [X ] No 22. Any other specific requirements: Primary combustion chamber only is required. Solid and inflammable waste products need to be capable of being recovered from the incinerator easily using an automated procedure. This is because the incinerator will be required to operate 24/7. Rotary kiln or moving floor may be considered if deemed practical by the supplier. One initial incinerator is required for a proof of concept project and future orders for the successful supplier, following successful implementation of this project, are likely to be significant.23. It would be most useful if the supplier could send a video of the incinerator in operation or diagrams and pictures to show how it works.

The Application of Open Burning and Incineration

The Application of Open Burning and Incineration The Department of Environment does not promote or endorse the burning and incineration of solid waste. This method of waste management should be...

Turbulence, Residence Time and Temperature are inbuilt in the plant design

No.    Parameter    Standards, Guideline, Criteria and Procedure 1    Basic Plant Design    An approved plant must have four distinct sections that demonstrate three principles of Turbulence, Residence Time and Temperature are...

Rwanda Waste Management Incinerator Solutions with HICLOVER

Rwanda Waste Management Incinerator Solutions with HICLOVER Rwanda has made significant progress in improving environmental infrastructure, yet hospital waste management remains a priority area. The government and donor agencies continue...

What’s the shipping document?

shipping document mean after the seller delivery equipment in china sea port, seller will send some document to buyer. after buyer receive equipment at local sea port, they use these...

Pet Animal Crematory Independent Movable Platform in-out Incinerator Chamber

Clover Incinerator update A model incinerator for pet cremation and animal incineration. New design accept independent movable platform in-out incinerator combustion chamber. This new design is valid for model A900...

SPECIFICATIONS OF THE JKUAT INCINERATOR

SPECIFICATIONS OF THE JKUAT INCINERATOR It should  be  a three chambered incinerator  The load capacity of 250 kg The housing for the incinerator should be able to withstand the temperatures and other operational requirements. The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc. It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan. The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion. In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the atmosphere. A system for continuous emission Monitoring and Environmental Monitoring. A mechanism with which to treat the waste water before discharge into the sewerage system. Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the chambers during operation. Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney). High power electricity and emergency generator connection for automated ignition purposes. The chimney should be tall enough and be at least one meter above the tallest building in the vicinity. The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire hazards. Capacity of 250. Other Requirements Training of all the personnel involved in health care waste (HCW) management. The Automatic Feeding system of the Incinerator Automatic waste loading mechanism with conveyor belts. These will lead the waste into the first primary chamber. An Automatic bottom ashes discharge system.

Clover Incinerator, new Logo be valid in coming year 2013

  Clover Medical Limited will use new Logo for our company and market.

Something about clover medical limited and clover incinerator

First, we are one manufacturer in china. we are in this field from year 2005 and at that time, we make trading business to oversea. Under support of our customer,...

Incinerator Series Model

Clover Incinerator