Clover Incinerator

Nanjing Clover Medical Technology Co., Ltd. is a leading waste incinerator manufacturer in China.

Waste Incinerator for Cleaner World

Medical Incinerators / Animal Crematory / PLC Incinerators

Contact with Us now for Inquiries

Call us on 0086-25-8461 0201 Email: sales@clover-incinerator.com

Incinerators Spare Parts

Full sapre parts in stock for incinerator operation.

Medical Waste Incineration

Incineration treatment technology for hospital medical waste.

We Work Efficiently

Our Sales Staff and Engineer are Wating for your inquiries and questions.

24/7 Live Support

Get To Know Further Information Before You Purchase. Contact with us by Phone or Email.

How to Delivery?

We arrange incinerator shipping to your local site included shipping cost and insurance.

Get Latest Incinerator Catalogue

Download PDF format Incinerator catalogue for your reference

Incinerator Dispatch Showcase

We delivery different capacity and model waste incinerator to all around the world. Find the business case to know more about the incinerator and us.

Welcome!

Nanjing Clover Medical Technology Co.,Ltd.

www.Incinerator.info  |   Call Us On  +86-25-8461 0201

Company Latest News

Laboratory waste Management system

Laboratory  waste Management  system 01. Liqued water purification system. 02. Number of laboratories – 05 03. The estimated liquid water waste – 6000 L including a. chemicals b. toxins c. Bio Hazardous materials. Temporary allocated space for purifications system- 30×20 The following should be indicating in the biding document 1.Method of disposing treated waste water 2.Method of discarding the sludge 3.To follow ISO standard/regulations of Central Environment Authority[CEA] 4.Time frame for construction 5.Request the cost for each item of the project [Consultancy/designing/construction] as well for the whole project. 6.Warranty period and maintaincne.  a. Pre-assembled, containerized type b. Burning rate: 100 – 120kg / hour c. Minimum operating temperature: 8500c (Primary combustion) d. Maximum operating temperature: 14500c (afterburner chamber) e. Secondary Burning capacity: Compulsory. f. Density insulation: 20 mm high g. Refractory casting: minimum 65mm h. Heavy duty refracting lining to withstand 15000c i. Average burn out time: maximum 3.0 hrs j. Fuel type: fuel oil (diesel) k. Fuel consumption in L/hr: 7.5 to 9 l. Residency time in secondary chamber: 2 secs. m. Residue ash post 100kg Max 3.8 kg...

Single Chamber Municipal Incinerator

the Single Chamber Incinerator

Burning Capacity: 400kg/ Hr ( Maximum Combustion time is 6 times/ Day) Chimney External Diameter: not more than 400mm Fan Power: must not exceed 1.1kw Voltage: 220V Oil Consumption: Must...

Waste Incinerator vs Pet Cremator

Incinerator means same with cremator if you said incineration, but there is some difference. a.) incinerator for waste. VS cremator for animals b.) incineration to be ash and clean it. VS...

Incinerator Ignition by Diesel

1.       Petrol: diesel 2.       Consumption: 8-10liter/hour 3.       Capacity: to cremate (carrion and spoils) 350-400kg/hour 4.       Temperature: 900-1350?C 5.       Operation temperature: -30~40?C 6.       Incinerator weight: 1800-2000 kg 7.       Volume: 0.70-0.80m/cube 8.       Exterior dimension: 1.4-1.6*1.0-1.15m (L*W) 9.       Trial able 10.   Incinerator mouth size: 50-60cm (W), 65-75cm (L) Ignition by Diesel Minimum burning temperature 1200 Celsius Burning capacity of 20 Tons per day. Cooling by water Burn Rate 100Kg/h Shipping Weight 4000kg Capacity 300Kg MINIMUM Max. Burn out time 3.0 hrs. Avg. Ash Residue 3% Heavy Duty refracting lining to withstand 15000C Min. Operating Temperature 8500C Max. Operating Temperature 14500C Residency Time in Secondary Chamber 2 sec. Density Insulation (high) 22mm Avg. Fuel Consumption p/hr 7 to 9ltr Fuel Dual, box & Oil/Diesel Temperature Monitoring YES Auto ignition YES Refractory Casting (min.) 65mm Refractory Casting (min) 65mm...

1 No. in Primary Chamber and 1No. in Secondary Chamber

No. of burners: 2 Nos. (1 No. in Primary Chamber and 1No. in Secondary Chamber)Type: Monoblock fully automaticFuel: DieselFuel Oil Storage Tank:Shall provide suitable capacity of oil storage tank.Material of Construction: Mild steel.Facility for visual checking of fuel shall be there.It shall have diesel consumption monitoring system.It shall come with diesel oil level indicator, piping with valves & N.R. valve.Control Panel:Type: Manual & Automated PLC based control panel with printer & recording device.Material of Construction: CRCA sheetIt shall have digital temperature controller.Epoxy powder coated washable paint finish.It shall have audio-visual alarm system.Chimney of 30 meters Height:Material of Construction: Mild SteelIt shall be self-supporting type.Height shall be 30 meters from ground level.Paint The chimney is painted externally with two coats of heat resistant aluminum paintShall provide ladder till the top.It shall have 3mm thick rubber lining from inside for protection.It shall come with aviation lamp, lightening arrestor, stack, drain, inspection platform, samplingport.Consumption certificate:The bidder must submit diesel consumption for a daily operation of 6 hours.Turnkey:Prices offered shall be inclusive of all civil works, electrical requirements including cabling andswitches required for installation & commissioning of the equipment.Bidder shall submit detail drawings, design, and layout plan of civil works.The bidder shall submit the details of BOQ of civil and electrical works.Accessories, spares and consumablesAll standard accessories, consumables and parts required to operate the equipment, includingall standard tools and cleaning and lubrication materials, to be included in the offer. Biddersmust specify the quantity of every item included in their offer (including items not specifiedabove).Operating EnvironmentThe system offered shall be designed to store and to operate normally under the conditions ofthe purchaser’s country. The conditions include Power Supply, Climate, Temperature,Humidity, etc.Power supply: 220-240 VAC, 50Hz single phase/400 C 420 VAC, 50Hz three phase asappropriate fitted with appropriate plug. The power cable must be at least 3 meter in length.Standards and Safety RequirementsIt shall have approval of “Pollution Control Board” of purchaser’s country.All mandatory approvals required for the installation and operation of incinerator shall be doneby the bidder.Must submit ISO 9001 ANDCE or USFDA approved product certificate.User TrainingMust provide user training (including how to use and maintain the equipment).WarrantyComprehensive warranty for 2 years after acceptance.Maintenance Service during Warranty PeriodDuring the warranty period supplier must ensure preventive maintenance along withcorrective/breakdown maintenance whenever required.Installation and CommissioningThe bidder must arrange for the equipment to be installed and commissioned by certified orqualified personnel; any prerequisites for installation to be communicated to the purchaser inadvance, in detail.

Pet Animal Crematory Independent Movable Platform in-out Incinerator Chamber

Clover Incinerator update A model incinerator for pet cremation and animal incineration. New design accept independent movable platform in-out incinerator combustion chamber. This new design is valid for model A900...

Top Feeding Door Solid Waste Incinerators HICLOVER

HICLOVER Top Feeding Door Waste Incinerators ▲▲▲Large Feeding Door ▲▲▲Better for Animal Waste Cremation ▲▲▲HICLOVER Brand Section ***Primary Combustion Chamber ***Secondary Combustion Chamber ***Smoke Filter Chamber ***Optional Wet Scrubber System(1...

Clover Incinerator, new Logo be valid in coming year 2013

  Clover Medical Limited will use new Logo for our company and market.

INCINERATORS AND ADDITIONAL EQUIPMENT

    minimum technical requirements   Item 1 Incinerator model A   Burn Rate 65kg/h minimum   Weight (kg), please indicate:   Secondary Chamber   Gas Retention Time – 2...

Regarding Shipping Insurance – One case from Macau, SAR

In year 2011, one Macau (China) place an order of incinerator, model SYC-30. This order under CIF business term and the carton ship via Hongkong port. Our shipping agent inform...

Spare Parts for Incinerator

Supply Full Spare Parts Together with Incinerator. Back up Oil Burner or Gas Burner, Temperature Thermocouple, Refactory Cement and Fire Brick in Stock for Continued Maintence. Main parts: Oil Burner,...

50kgs per hour incinerator for Oman farm animal cremation

New incinerator delivery for our  poultry project to burn dead chickens in Oman.

Waste Incineration Treatment Model TS1000 1000kgs per hour Top Feeding

Items/Model TS1000 Picture   Principle Waste Incineration Treatment Burn Rate Average 1000 kg/hour Feed Capacity Average 3000kg/feeding Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 4800Liter Internal Dimensions 400*120*100 cm Secondary Chamber...

New Year Holiday 2015

Chinese New Year Holiday coming, we will close factory from 14th to 28th Feb. 2015. Thanks for every customer’s supporting during passed year 2014 and we will work hard to...

guidelines on waste management Incinerator Model YD-20C

Item Specification Model YD-20C Main Product List   Primary Combustion Chamber Secondary Combustion Chamber Mix-Combustion Chamber Smoke Filter Chamber Incinerator Control Case Chimney:5.0Meters *(upgrade to Stainless Steel, free cost) Italy oil...

Chinese New Year!

we will be in Chinese New Year Holiday from 25th Jan to 12 Feb, 2014. Thanks for all customer all over the world and our staffs. Best wishes to you...

New Product Catalogue and User Guide issued

How to instal waste incinerator?

Incinerator Series Model